| Sign In | Join Free | My uabig.com |
|
Packaging Details : Per request
Control System : PLC Touch Screen Control
Dimension : Customizable based on production scale
Place of Origin : China
Certification : CE/ISO/SGS
MOQ : 1 set
Daily Throughput : 20,000-30,000 pairs
Air Compressor : Required, specifications vary
Brand Name : Zhihui
Power Input : 3×380V + N / 50Hz
Machine Type : Automatic/ Semi-Automatic
Automation Level : High automation with minimal manual intervention
Model Number : Customized
Drying System : Hot air circulation drying
Material : Stainless Steel/Galvanized Steel
Production Capacity : 5000-100,000 pairs per day
Compressed Air : 0.5-0.8 MPa
Safety Features : Emergency stop, overload protection
Glove Types : Latex, Nitrile, PU, PVC, Silicone
Delivery Time : 40-60 work days
Power Supply : 380V/50Hz or customizable
Line Dimensions : 65m × 2.5m × 4.7m (frame only, excl. blower height)
Weight : Customized
Cycle Duration : 25-45 seconds
Supply Ability : 50 sets per year
Price : Negotiable
Installed Power : 50 kW
Dipping Tanks : Customized
Payment Terms : TT
Warranty : 1 year
| Parameter | Value |
|---|---|
| Line Dimensions (L*W*H) | 65m * 2.5m * 4.7m (frame only, excl. blower height) |
| Daily Throughput | 20,000-30,000 pairs |
| Cycle Duration | 25-45 seconds |
| Installed Power | 50 kW |
| Power Input | 3*380V + N / 50Hz |
| Compressed Air Supply | 0.5-0.8 MPa |
| Control Architecture | Delta PLC |
| Heating Energy | Natural Gas |
| Heating Medium | Thermal oil (320#) + Blower hot air |
| Crew Required | 3-4 operators per shift |
| Stage | Tank | Function |
|---|---|---|
| 1 | Coagulant-1 | Primary coagulant |
| 2 | Compound Dip-1 | First-layer latex/NBR coating |
| 3 | Foam | Foam-layer application |
| 4 | Crinkle | Crinkle texture formation |
| 5 | Coagulant-2 | Secondary coagulant |
| 6 | Compound Dip-2 | Second-layer coating |
| 7 | Sandy | Sandy/grip finish |
| Phase | Coverage |
|---|---|
| Warranty | 12 months from commissioning |
| Remote Diagnostics | Complimentary video-assisted troubleshooting |
| On-Site (Warranty Period) | Spare parts + labor: ZHIHUI covers; travel & accommodation: Buyer covers |
| On-Site (Post-Warranty) | All costs (parts, labor, travel, accommodation): Buyer covers |
| Installation Team | 2 technicians (mechanical + electrical), 30-40 working days |
| Formula Support | Optional expert dispatch |
|
|
Industrial Glove Making Equipment CNC Controlled Gloves Production Machine Images |